Utility-scale solar case study
Red Mesa Solar Farm
- Location
- Arizona
- Project date
- 2025
- Project Size
- 2,200 Acres
- Solar Capacity
- 1,250 MW
- Yards Moved
- 1.3 Million
- Road Construction
- 17 Miles
Project Overview
The Red Mesa Solar Farm, located in the Southwestern United States, is a utility-scale renewable energy project designed to support regional power demand and grid reliability. Spanning approximately 2,200 acres, the project integrates large-scale solar generation with supporting electrical infrastructure.
Positioned to take advantage of high solar irradiance and proximity to existing transmission access, the Red Mesa Solar Farm is part of a broader effort to expand clean energy capacity while maintaining long-term performance and efficiency.
Scope of Work
Black Mountain Excavation was contracted to perform site development and earthwork operations for this large-scale solar installation.
Our scope included:
- Mass grading and site balancing
- Equipment pad and array field preparation
- Access roads and maintenance routes
- Stormwater and drainage infrastructure
- Subgrade preparation for solar tracker installation
Working across a large footprint, our team executed precision earthmoving operations to create consistent grading tolerances required for solar array alignment and long-term system performance.
Utilizing GPS-controlled equipment and efficient material management strategies, we ensured the site met strict engineering and installation specifications.
Challenges & Solutions
The project presented challenges typical of large-scale solar developments, including remote site logistics, varying soil conditions, and the need for high-precision grading across long distances.
Our team addressed these challenges through:
- Optimized haul routes and site access planning
- Strategic material balancing to reduce export/import
- Phased grading to support installation crews
- Tight tolerance control for solar tracker alignment
Coordination with contractors and installation teams ensured seamless workflow between earthwork and solar infrastructure installation.
Timeline & Budget
Construction progressed through multiple phases, with earthwork operations aligned to support ongoing solar installation activities.
Black Mountain Excavation maintained schedule efficiency through scalable operations, proactive planning, and strong field execution, ensuring critical milestones were achieved while maintaining safety and quality standards.
Impact & Future
Once complete, the Red Mesa Solar Farm will contribute clean, renewable energy to the regional grid while supporting long-term sustainability initiatives.
This project highlights Black Mountain Excavation’s expertise in delivering efficient, high-quality site development for utility-scale solar projects, reinforcing our role as a trusted partner in renewable energy construction.
Project gallery
10 photos · select any photo to enlarge
Keep digging
More projects

Utility-scale solar · Colorado · 2025
Black Hollow Sun Solar, Phase 2
- Project Size
- 936 Acres
- Solar Capacity
- 365 MW

Residential utilities and site development · Elbert County, Colorado · 2025
Sundance Residential Development

Utility-scale solar · Colorado · 2024
Black Hollow Sun Solar, Phase 1
- Project Size
- 2,100 Acres
- Solar Capacity
- 250 MW
Request a bid
Let’s shape your next project
Tell us about your site, scope, and schedule. Black Mountain Excavation will get back to you with next steps.
Monday to Friday, 8am to 5pm